Simulation-based Feature Selection for Software Requirements Baseline
Abstract
Keywords
References
[1] J. K. Pinto, Project Management, 2 ed., 2002.
[2] R. N. Charette. (2005). Why Software Fails? . Available: http://spectrum.ieee.org/computing/software/why-software-fails/
[3] N. F. Matta and R. N. Ashkenas, "Why good projects fail anyway," Harvard Business Review, vol. 81, pp. 109-116, 2003.
[4] P. J. Denning and R. D. Riehle, "The profession of IT Is software engineering engineering?," Communications of the ACM, vol. 52, pp. 24-26, 2009.
http://dx.doi.org/10.1145/1467247.1467257
[5] J. F. Wateridge, "Delivering successful IS/IT projects: eight key elements from success criteria to review via appropriate management, methodologies and teams," Brunel University, London, 2010.
[6] R. Leus, "The generation of stable project plans," 4OR: A Quarterly Journal of Operations Research, vol. 2, pp. 251-254, 2004.
[7] D. Leffingwell and D. Widrig, Managing Software Requirements : A Use Case Approach (2nd Edition): Addison wesley, 2003.
[8] K. E. wiergers. (1999) First Things First: Prioritizing Requirement. Software Development
[9] D. Port, et al., "Using Simulation to Investigate Requirements Prioritization Strategies," presented at the Proceedings of the 2008 23rd IEEE/ACM International Conference on Automated Software Engineering, 2008.
[10] S. Lazarova-Molnar, "The Proxel-Based Method: Formalisation, Analysis and Applications," Ph.D. Ph.D., Faculty of Informatics, University of Magdeburg, Magdeburg, 2005.
[11] C. Isensee and G. Horton, "Proxel-Based Simulation of Project Schedules," 2004.
[12] W. Huang, et al., "Project Scheduling Problem for Software Development with Random Fuzzy Activity Duration Times," in Advances in Neural Networks – ISNN 2009. vol. 5552, W. Yu, et al., Eds., ed: Springer Berlin / Heidelberg, 2009, pp. 60-69.
[13] M. J. Sobel, et al., "Scheduling projects with stochastic activity duration to maximize expected net present value," European Journal of Operational Research, vol. 198, pp. 697-705, 2009.
http://dx.doi.org/10.1016/j.ejor.2008.10.004
[14] J. Navascu, et al., "A Hybrid Model for Dynamic Simulation of Custom Software Projects in a Multiproject Environment," presented at the Proceedings of the International Conference on Software Process: Trustworthy Software Development Processes, Vancouver, B. C., Canada, 2009.
[15] S. Lazarova-Molnar and R. Mizouni, "A Framework for Enhanced Project Schedule Design to Aid Project Manager’s Decision Making Processes," presented at the The 23rd European Modeling & Simulation Symposium, Rome, Italy, 2011.
[16] D. K. M. Mak and P. B. Kruchten, "NextMove: A Framework for Distributed Task Coordination," in Software Engineering Conference, 2007. ASWEC 2007. 18th Australian, 2007, pp. 399-408.
[17] A. Al-Emran, et al., "Application of re-estimation in re-planning of software product releases," presented at the Proceedings of the 2010 international conference on New modeling concepts for today's software processes: software process, 2010.
[18] N. F. N. G. Amandeep, et al., "Intelligent Support for Software Release Planning," in Product Focused Software Process Improvement. vol. 3009, F. Bomarius and H. Iida, Eds., ed: Springer Berlin / Heidelberg, 2004, pp. 248-262.
[19] S. Lazarova-Molnar and R. Mizouni, "Modeling Human Decision Behaviors for Accurate Prediction of Project Schedule Duration," in Enterprise and Organizational Modeling and Simulation. vol. 63, J. Barjis, Ed., ed: Springer Berlin Heidelberg, 2010, pp. 179-195.
[20] S. Lazarova-Molnar and R. Mizouni, "Floating Task: Introducing and Simulating a Higher Degree of Uncertainty in Project Schedules," presented at the IEEE Workshop on Collaborative Modeling and Simulation (CoMetS 2010), Greece, 2010.
[21] D. Firesmith, "Prioritizing Requirements," Journal of Techology, vol. 3, pp. 35-48, 2004.
[22] D. Dubois and H. Prade, "What are fuzzy rules and how to use them," Fuzzy sets and systems, vol. 84, pp. 169-185, 1996.
http://dx.doi.org/10.1016/0165-0114(96)00066-8
[23] T. P. Hong and J. B. Chen, "Processing individual fuzzy attributes for fuzzy rule induction," Fuzzy sets and systems, vol. 112, pp. 127-140, 2000.
http://dx.doi.org/10.1016/S0165-0114(98)00179-1
[24] D. R. Cox, "The analysis of non-Markovian stochastic processes by the inclusion of supplementary variables," Proceedings of the Cambridge Philosophical Society, vol. 51, pp. 433-441, 1955.
http://dx.doi.org/10.1017/S0305004100030437
[25] G. Horton, "A new paradigm for the numerical simulation of stochastic Petri nets with general firing times," Proceedings of the European Simulation Symposium, 2002.
[26] W. J. Stewart, Introduction to the Numerical Solution of Markov Chains.: Princeton University Press, 1994.
[27] F. J. Lin, et al., "Protocol verification using reachability analysis: the state space explosion problem and relief strategies," ACM SIGCOMM Computer Communication Review, vol. 17, pp. 126-135, 1987.
http://dx.doi.org/10.1145/55483.55496
[28] C. Isensee and G. Horton, "Approximation of Discrete Phase-Type Distributions," Proceedings of the 38th annual Symposium on Simulation, pp. 99-106, 2005.
http://dx.doi.org/10.1109/ANSS.2005.12
Full Text: PDF


