Analysis of Load Factors Based on Interpretive Structural Model
Abstract
Keywords
References
[1] [ZHOU Xiao, LI Na-na, YANG Ying, Analysis of the power demand side management based on ISM, RELAY, 2007, 35(7): 58-60.
[2] HE Yong xiu, TAO Wei jun, YANG Wei hong. Urban Power Load Forecasting Based on an Interpretative Structural Model, Automation of Electric Power System, 2009, 33(20): 37-42.
[3] KANG Chongqing, YANG Gaofeng, XIA Qing. Analysis on the uncertainty of electrical demand, Automation of Electric Power Systems, 2005, 29 (17): 14-19, 39.
[4] HAN Jinshan, TAN Zhongfu, LIU Yan. Research on interpretative structure modeling for risks of electricity retail market, Power System Technology, 2005, 29(8): 14-19.
[5] LI Hanfang, TAN Zhongfu, WANG Chengwen, et al .Interpretative structural model based risk structural analysis of power generation company in electricity market, Power System Technology, 2007, 31 (13): 59-264.
[6] HAN Jinshan, TAN Zhongfu. An interpretative structure model for generalized electric power system, Automation of Electric Power Systems, 2008, 32 (20): 42-49.
[7] KANG Chongqing, MU Tao, XIA Qing. Power system multilevel load forecasting and coordinating: Part one research framework, Automation of Electric Power Systems, 2008, 32 (7): 34-38.
[8] SUN Hui, ZHOU Ying, FAN Zhi-qing. An Analysis of the Influencing Factors of Public Transportation Passenger Flow on the Base of Interpretive Structural Model, JOURNAL OF BEIJING INSTITUTE OF TECHNOLOGY (SOCIAL SCIENCES EDITION), 2010, 12(1): 29-32.
[9] WEI Lingyun, WU Jie, LIU Yongqiang. Long term electric load forecasting based on system dynamics, Automation of Electric Power Systems, 2000, 24 (16): 44-47.
[10] XIAO Jun, ZHANG Jing, ZHU Tao, et al. Analysis of urban power load based on association rules, Automation of Electric Power Systems, 2007, 31 (17) : 103-107.
[11] YANG Bin,YU Bo, SUN Qian. Research on risk generating mechanisms of overseas oil and gas development projects based on an interpretative structural model, Journal of Harbin Engineering University, 2010, 31(9): 1259-1264.
[12] TANG Zhi-wei, DU Ren-jie, GAO Tian-pen. Risk Analysis of E-Government Information System Based on ISM, Journal of UEST of China, 2005, 34(2): 251-253.
[13] WANG Yuan- ming, ZHAO Dao- zhi. The Transmission Model of Controlled Quality Risks in Construction Projects, Business Economics and Administration, 2008, (6): 15-20.
[14] YIN Hong-yang, XU Li-qun, QUAN Xiao-feng. Research on Influencing Factors of Road Network's Vulnerability Based on Interpretive Structural Model, Soft Science, 2010, 24(10): 122-126.
[15] XU Min-jie, HU Zhao-guang, SHAN Bao-guo, WU Jun-yong. Analysis on influencing factors of electricity demand by using interpretative structural modeling, Electric Power, 2009, (4): 1-5.
[16] ZHANG Zi-jian. Research of risk cause of formation of product development item based on the explanatory structural model, Ship Engineering, 2007, 29(6): 88-91.
[17] Liu Wei, Liu Lu. Risk Analysis of Knowledge System Based on ISM, Computer Engineering and Applications, 2006, 42(14): 134-136.
[18] Gu XiaoXia. The Systematic Analysis on the Regional Risk of High Technology Projects Based on Interpreted Structural Model, Industrial Engineering and Management, 2005, 10(4): 70-75.
[19] Kim, I.; Watada, J. Decision Making With an Interpretive Structural Modeling Method Using a DNA-Based Algorithm, NanoBioscience, 2009, 8(2): 181-191.
http://dx.doi.org/10.1109/TNB.2009.2023788
PMid:19497835
[20] ZHENG Zhi-jie, LI Lei, ZHAO Lan-ming. Medium and long term load forecasting considering data uncertainty, Relay, 2011, 39(7): 123-126, 132.
[21] SUN Da-shuai, MA Li-xin, WANG Shou-zheng. Design of short-term load forecast systems based on the theory of complex systems, Journal of University of Shanghai For Science and Technology, 2011, 32(1): 39-43.
[22] YANG Hu-ping, BI Zhi-peng. Particle Swarm Optimization- based Grey Model for Long- term Load Forecasting, Electrical Measurement & Instrumentation, 2011, 48(2): 40-43, 63.
[23] ZHU Ji-ping, DAI Jun. Optimization Selection of Correlative Factors for Long -term Load Prediction of Electric Power, Computer Simulation, 2008, 25(5): 226-229.
[24] LIAO Li, XIN Jian-hua, ZHAI Hai-qing, WEI Zhen-hua. Short Term Load Forecasting Model and the Influencing Factors, JOURNAI OF SHANGHAI JIAOTONG UNIVERSITY, 2004, 38(9): 1544-1547.
[25] JI Xun-sheng. Short-term power load forecasting on partial least square support vector machine, Relay, 2010, 23: 55-59.
[26] FANG Ge-fei1, HU Chang-hong1, ZHENG Yi-hui, CAI Jin-ming. Study on the method of short-term load forecasting considering summer weather factors, Relay, 2010, 22: 100-104.
[27] WANG Feng-shan, ZHU Wan-hong, WANG Quan-peng. Constructing quality systems of engineering equipment based on ISM, Journal of PLA University of Science and Technology(Natural Science Edition), 2005, 6(5): 479-483.
[28] CHENG Bo, LI Bing-xiang. Interpretative Structural Modeling Method Based on Analysis of Entrepreneurs Capacity Factors, Journal of Xi’ an University of Technology, 2010, 2: 239-245.
[29] SHI Xiao-bo, et al. Analysis of Interpretative Structural Model on the Influencing Factors in New Rural Housing Construction Quality, Journal of Anhui Agricultural Sciences, 2009, 26: 12853-12854
[30] WANG Wanqiu, ZHANG Yong'an. Research on Factors Influencing Technology-Based Mergers and Acquisitions Synergy, Science of Science and Management of S.& T., 2009, 30(4): 104-109, 193.
[31] Wang MeiYuan, Lu YaoBin, Zhang JinLong. An Empirical Analysis on the Whole Process Risk Structure to the Software Outsourcing Project, 2006, 23(4): 139-142.
[32] Su Ju-ning, Shi Chuan-fang. ISM-Based Impact Factor Analysis in the Selection of Logistics Mode in Manufacturing Enterprises, Industrial Engineering Journal, 2009, 12(4): 6-10.
[33] ZHU Zhao-xia, ZOU Bin. Risk model of distribution utilities and analyzing the infection on the load factor in electricity market, Relay, 2007, 35(12): 56-60.
[34] Yang Yonghui, Xiao Xiumei. The reascher on an alyzing the impact factors of regional sustainable development base on the approach of system engineering, Scientific Management Research, 2008, 26(3): 57-59. [30] WANG Wanqiu, ZHANG Yong'an. Research on Factors Influencing Technology-Based Mergers and Acquisitions Synergy, Science of Science and Management of S.& T., 2009, 30(4): 104-109, 193.
[35] Wang MeiYuan, Lu YaoBin, Zhang JinLong. An Empirical Analysis on the Whole Process Risk Structure to the Software Outsourcing Project, 2006, 23(4): 139-142.
[36] Su Ju-ning, Shi Chuan-fang. ISM-Based Impact Factor Analysis in the Selection of Logistics Mode in Manufacturing Enterprises, Industrial Engineering Journal, 2009, 12(4): 6-10.
[37] ZHU Zhao-xia, ZOU Bin. Risk model of distribution utilities and analyzing the infection on the load factor in electricity market, Relay, 2007, 35(12): 56-60.
[38] Yang Yonghui, Xiao Xiumei. The reascher on an alyzing the impact factors of regional sustainable development base on the approach of system engineering, Scientific Management Research, 2008, 26(3): 57-59.
Full Text: PDF


